When a Salesforce org has custom development and integrations, every Salesforce update is a change that reaches production on a fixed date. The next one is Spring '27. According to Salesforce developer documentation, preview sandboxes are upgraded starting January 10, 2027, and by February 20 every instance is on the new version. In this post we propose a regression plan for that window that can be repeated with every update.
What happens with each Salesforce update
Salesforce updates the platform several times a year, and each version is named after a season. The previous one was Winter '27, with a preview window that ran from August 30 to October 10, 2026.
Each window has two moments. First, the preview sandbox instances are upgraded. Then, on different dates, the rest are upgraded, until every instance is on the generally available version. That gap of several weeks is the chance to test the new version against your org's custom work before it reaches production. The date for each instance can be checked on Salesforce Trust.
Some changes arrive enabled without anyone asking for them. In Winter '27, for example, Salesforce enabled the Agentforce platform in every existing org with access to Agentforce, according to its release note. Changes like that move settings and access that are worth reviewing in the same cycle as the regression.
What to test in the preview sandbox
Testing starts with an inventory of what is specific to the org, because that is what an update can affect. We would split that inventory into four groups:
- Custom code, such as Apex classes and Lightning components.
- Declarative automation, such as flows.
- Integrations with other systems, which depend on API versions and permissions.
- Business processes that cannot fail, tested end to end, such as onboarding a customer or handling a case.
With that inventory, the plan becomes a list of tests ordered by priority. The release notes are read with a filter on the products and features the org uses, and every change that touches something in the inventory adds a case to the list.
Integrations deserve separate attention. When an external system connects to Salesforce, the test has to cover both sides: that the connection keeps working and that the data arrives in the format the other system expects. It is worth including at least one full run through each integration in the regression, with the external system in its own test environment.
For the test to be useful, the preview sandbox has to resemble production in data and configuration. A regression on an outdated sandbox tests a different org. It is worth refreshing it before the preview window starts.
A regression plan for every Salesforce update
Our recommendation is to treat each update as a fixed cycle on the calendar, with the same stages every time. That way the team knows what to do and when, without rebuilding the plan from scratch.
| Moment | What to do |
|---|---|
| When Salesforce publishes the release notes | Read them with a filter on what the org uses and add cases to the plan. |
| When the preview sandbox is upgraded | Run the automated regression and the business process regression, and log every difference. |
| Before the production instance date | Fix what failed and decide which configuration changes are needed. |
| After the production update | Run a short check on the processes that cannot fail. |
A regression like this is worth automating. If every update forces the team to rebuild tests by hand, the plan competes with the rest of the team's work and the preview window is only half used. With automated regression, the same set runs in the preview sandbox and again after the production update.
For the production check, a set limited to the processes that cannot fail works well, with a named owner for that day. It confirms that what passed in the preview sandbox also passed in the real org.
Teams that build second-generation managed packages have one more tool. Salesforce lets them create package versions against the preview version to test upcoming features and run regression tests before the update, according to its developer guide.
Who owns regression in each version
Keeping regression up to date is work that comes back with every update. It can be handled by the in-house team, if it has time set aside for each preview window, or by an evolutionary support service that includes testing each version. What is worth avoiding is a regression that depends on someone remembering the date.
Logging the results of each cycle also helps. A list of what failed in each update, with its cause and its fix, shows which parts of the org react to Salesforce changes and where it is worth adding automated tests for the next cycle.
Where to start depends on how much custom development the org has and which processes cannot fail. We handle it within our Salesforce service, together with test automation. And if the Agentforce platform is already enabled in your org, this post covers what is worth reviewing.